Existing method : 3m of concrete box girders are made in casting bed for the superstructure work for PSM bridge, and 20 of them are connected at the construction site
For high-speed railway construction
25m length of box girders are produced in a factory, and transported to the construction site with special conveyor to be installed. In this way the best quality and reducing construction period can be possible through factory production and mechanized construction, which also provides a chance to step up domestic construction level.