Go to content Go to Main menu

Close Full menu

Go to main page KR TECHNOLOGY Track

Track

Track

Track system of High-Speed Railway

Track system of High-Speed Railway
Gyeongbu 1st
(Gwangmeyeong~Daegu)
Gyeongbu 2nd
(Daegu-Busan)
Honam(Osong-Songjeong)
Suseo(Suseo-Pyeongtaek)
Ballast track Concrete track
KCT-Ⅱ RHEDA2000
[Complete view]
Complete view [Fastening device] Rail Fastening System [Turnout] High Speed Turnout
[Rail fastening device]
[Fastening device] Rail Fastening System [Fastening device] Rail Fastening System [Fastening device] Rail Fastening System
[High-speed Turnout]
[Turnout] High Speed Turnout [Turnout] High Speed Turnout [Turnout] High Speed Turnout

Procedure of High-speed Railway track construction

Ballast track

    • Ballast track
  • Construction of temporary
    track [Track1]
    Construction of temporary track [Track1] Image
  • Laying of ballast gravel
    [Track1]
    Laying of ballast gravel [Track1] Image
  • Laying of ballast gravel
    [Track2]
    Laying of ballast gravel [2track] Image
  • Unloading CWR
    [Track1]
    Unloading CWR [Track1] Image
  • Unloading CWR
    [Track2]
    Unloading CWR [Track2] Image
  • Assembly of track panel
    [Track1]
    Assembly of track panel [1track] Image
  • Assembling of track panel
    [Track2]
    Assembly of track panel [Track2] Image
  • Field rail welding Field rail welding Image
  • Ballast spraying & tamping Ballast spraying & tamping Image

Concrete track

    • Concrete track
  • HSB Construction HSB Construction Image
  • Take-in of Track Materials Take-in of Track Materials Image
  • Arrangement of Sleeper and fastening device Arrangement of tie and fastening device Image
  • Arrangement of track panel and reinforcing bar Arrangement of track panel and reinforcing bar Image
  • Setting up
    the track panel holders
    Setting up the track panel holders Image
  • Precise linear survey
    and correction
    Precise linear survey and correction Image
  • TCL Construction TCl Construction Image
  • Laying of CWR Laying of CWR Image
  • Complete view Complete view Image

Precast concrete Slab Track (PST)

  • Take over Survey Take over Survey Image
  • Carrying of Panel Carrying of Panel Image
  • Panel Installation Panel Installation Image
  • Spindle Installation Spindle Installation Image
  • Precise linear survey Precise linear survey Image
  • Install Shear Anchor Install Shear Anchor Image
  • Inspection before Filling Inspection before Filling Image
  • Filler Injection Filler Injection Image
  • Complete view Complete view Image

Domestic development of Track core component

  • For developing railroad industry and independence of technology, verified performance at field attachment test while construct concrete track on Gyeongbu, Honam High-speed railway and succeed in domestic production.

KR fastening device for Concrete track

    • KR fastening device

Sound absorbing board for Concrete track

    • Sound absorbing board for track

High-speed Turnout for Concrete track

    • High-speed Turnout

Precast concrete Slab Track (PST)

    • Precast concrete Slab Track (PST)