This facility enables to separate/move/replace the inspection subject toward underground pit at the bottom of the vehicle for fast maintenance work with separated bogie instead of lifting 1~2 bogie, wheelset, and traction motor simultaneously in KTX train set (20 cars: 400m approximately) state.
Main components
Dropping table main body (max. 400kN), supporting jack(4개*250kN), rail hatch, control board/pendant
Dropping table / hydraulic power pack / driving gear
Supporting jack (4 jacks)
Rail hatch
Control board and pendant
Job sequence
Dropping table waiting on the bogie exchange line
Rolling Stock enters to the bogie exchange line
Support the rolling stock with supporting jacks
Open the rail hatch and move the bogie to the workplace
Descend the separated bogie and move it toward rail hatch line
Separate devices including bogie from the bottom of the vehicle while it is supported