  • Construction supervision on the Su-Ching line
    Dual-track assembly, Yiahm tunnel

    (left)Dual-track assembly, (right)Yiahm tunnel

    Project name
    Construction supervision services on the newly constructed railroad of the Suining~Chongqing passenger line
    Project section
    Total 12.63㎞ of extension line between Lomgfeng tunnel~Janga Bridge
    *Construction supervision and consultation on the test line section on concrete track
    Project period
    2005. 5. ~ 2006. 8. (15 months)
  • Construction process supervision on the Wu-Guang line
    Dongho River Arch Bridge, Concrete track skeleton assembly

    (left)Dongho River Arch Bridge, (right)Concrete track skeleton assembly

    Project name
    Construction process supervision services on the newly constructed railroad of the Wuhan~Guangzhou passenger line
    Project section
    152.8㎞ between Wuhan~ Aksang province border(Border between Hubei province and Hunan province)
    *The 1st work zone of total 918㎞ of four work zones
    Project period
    2006.1. ~ 2010. 2. (50 months)
  • Engineering consulting on the Ha-Da line
    Existing high-speed railway operation next to the construction site, PSM construction method for Machingtun Grand Bridge, Pile foundation deposition in the bridge site

    (1)Existing high-speed railway operation next to the construction site, (2)PSM construction method for Machingtun Grand Bridge, (3)Pile foundation deposition in the bridge site

    Project name
    Engineering consulting service on the Harbin~Dalian passenger line
    Project section
    903.94㎞ between Harbin~Dalian, designed speed 350㎞/hr
    Project period
    2008. 3. ~2012.12. (58 months)
  • Engineering consultation on the Tian-Qin line
    Arch bridge site inspection on Tian-Qin line (Tianjin-Qinhuangdao passenger line)

    Arch bridge site inspection on Tian-Qin line (Tianjin-Qinhuangdao passenger line)

    Project name
    Engineering consulting service on the Tianjin~Qinhuangdao passenger line
    Project section
    257.438㎞ between Tianjin~Qinhuangdao, designed speed 350㎞/hr
    Project period
    2010. 5. ~2012.12. (32 months)
  • Engineering consultation on the Pan-Xin line
    High-speed railway crossing Grand Bridge, Panjin Grand Bridge

    (left)High-speed railway crossing Grand Bridge, (right)Panjin Grand Bridge

    Project name
    Engineering consulting service on the Panjin~Xinhai province passenger line
    Project section
    89.422㎞ between Panjin~Xinhai province, designed speed 350㎞/hr
    Project period
    2010. 5. ~2012.12. (32 months)
  • Engineering consultation on the Xi-Bao line
    PSM Bridge, Concrete track construction on the bridge

    (left)PSM Bridge, (right)Concrete track construction on the bridge

    Project name
    Engineering consulting service on the Xian~Baogi passenger line
    Project section
    Approximately 138㎞ between Xianyang(咸陽)~Baogi(寶鷄)
    Project period
    2010. 5. ~ 2013. 6. (38 months)
  • The Lan-Xing line (Lanzhou~Xingang) Xingang section project
    A panorama of completed construction of the Lan-Xing high-speed railway (Lanzhou-Xingang Urumuqi), The start area of the Xingang section on the Lan-Xing line

    (left)A panorama of completed construction of the Lan-Xing high-speed railway (Lanzhou-Xingang Urumuqi), (right)The start area of the Xingang section on the Lan-Xing line

    Project name
    Technical consulting service for the 2nd double track Xingang section on the newly constructed Lan-Xing line
    Project section
    Approximately 709.93㎞ between Hongliuhe~Urumuchi
    * Earthworks: 507.98㎞, bridge: 119.641㎞, 14 tunnels: 19.309㎞
    Project period
    2010. 5. ~ 2014. 6. (49 months)
  • The Lan-Xing line (Lanzhou~Xingang) Gamcheong section project
    The Lan-Xing line (Lanzhou~Xingang) Gamcheong section project
    Project name
    Technical consulting service on the 2nd double track Gamcheong section in the newly constructed Lan-Xing line
    Project section
    Approximately 1,066㎞ between Lanzhou~ Hongliuhe
    Project period
    2010. 5. ~ 2014. 8. (52 months)
  • Engineering consulting on the Ha-Qi line
    Route map, Bridge slab concrete depositing, Bridge construction in railroad cross-section

    (1)Route map, (2)Bridge slab concrete depositing, (3)Bridge construction in railroad cross-section

    Project name
    Engineering consulting service on the Harbin~Qiqihar passenger line
    Project section
    280.893㎞ between Harbin~Qiqihar, designed speed 250㎞/hr
    Project period
    2010. 5. ~ 2015. 6. (61 months)
  • The Chang-Kun line (Changsha~Kunming) Guizhou section project
    중국 장곤선(장사-곤명 여객전용선) 귀주구간 시공감리 이억한 총감리공정사 터널 현장점검

    Leeukhan, general construction supervisor for construction supervision on Gwiju section on the Chang-Kun line (Changsha-Kunming passenger line) in China
    Tunnel site inspection

    Project name
    Construction supervision service on Guizhou(貴州) the 2nd section in the newly constructed Chang-Kun passenger line
    Project section
    94.446㎞ between Yuping County~Bibanpo Tunnel, designed speed 250㎞/hr
    * Earthworks: 14.107㎞, 55 bridges: 14.954㎞, 48 tunnels: 63.385㎞, 1 station (Gaerinam)
    Project period
    2010. 9. ~ 2015. 4. (56 months)
  • Construction Supervision Services for Changsha-Kunming HSR (Yunnan section)
    Site inspection by Gangseokmok tunnel construction supervisor on Daepyeongji tunnel in Yunnam section of the China Chang-Kun line, KEY-SEG construction for Hwangtopa Grand Bridge	PSM bridge slab construction on Jachung Grand Bridge

    (1)Site inspection by Gangseokmok tunnel construction supervisor on Daepyeongji tunnel in Yunnam section of the China Chang-Kun line, (2)(3)KEY-SEG construction for Hwangtopa Grand Bridge PSM bridge slab construction on Jachung Grand Bridge

    Project name
    Construction supervision service on Yunnam(雲南) the 2nd section in the newly constructed Chang-Kun passenger line
    Project section
    97.4㎞ between Shashatang Grand Bridge~south of Kunming, designed speed 250㎞/hr
    * Earthworks: 32.038㎞, 71 bridges: 28.682㎞, 23 tunnels: 36.692㎞
    Project period
    2010. 9. ~ 2016. 2. (66 months)
  • Construction Supervision Services for Zhengzhou-Xuzhou HSR
    Route map, Jeongbyeon Grand Bridge FCM bridge, Jeongbyeon Grand Bridge PSM bridge

    (1)Route map, (2)Jeongbyeon Grand Bridge FCM bridge, (3)Jeongbyeon Grand Bridge PSM bridge

    Project name
    Construction supervision service on the 1st work zone in the newly constructed Zheng-Xuz passenger line
    Project section
    43.81㎞ between Zhengzhou~Xuzhou, designed speed 250㎞/hr
    Project period
    2013. 1. ~ 2017. 1. (48 months)
    Ordering organization
    Zheng-Xuz passenger Line Corporation
  • Construction supervision on Liaoning 3rd work zone on the Bei-Shen line (Beijing~Shenyang)
    Route map, Pile steel form Installation, Bridge slab manufacturing

    (1)Route map, (2)Pile steel form Installation, (3)Bridge slab manufacturing

    Project name
    Construction supervision service on Liaoning the 3rd work zone in the newly constructed Bei-Shen passenger line
    Project section
    78㎞ between Liujiawopu Grand Bridge~Shanghe Bridge, designed speed 350㎞/hr
    Project period
    2014. 7. ~ 2017. 6. (33 months)
  • Construction supervision on Liaoning section on the Beijing~Shenyang line
    Project name
    Construction supervision on Liaoning(遼寧) section of Beijing~Shenyang passenger line
    Project section
    77.8km Liaoning(遼寧) section between Beijing(北京) and Shenyang(瀋陽)
    (roadbed: 28.7km, 33 bridges: 30.6km, 11 tunnels: 18.5km)
    Project period
    Jul. 2014 ~ Dec. 2016 (30 months)
  • Construction Supervision Services for Shanghai-Hefei-Hangzhou HSR (Anhui-Zhejiang section)
    Project name
    Construction supervision service on Anhui~Zhejiang section of the newly constructed Shangqiu(常州)~Hefei(合肥)~Hangzhou(杭州) passenger line
    Project section
    27.5km between Anhui(安徽) and Zhejiang(浙江)
    Project period
    Mar. 2016 ~ Aug. 2018 (30 months)
  • Construction Supervision of Services on Chongqing section in the Zheng-Nam
    Project name
    Construction Supervision Service on Chongqing section in the newly constructed Zheng-Man passenger line
    Project section
    Priority section (length: 12.3㎞, bridge: 0.3㎞, tunnel: 12.0㎞)
    Project period
    Mar. 2016 ~ Jun. 2019 (40 months)