High-Speed Railroad Depot |
Tally shed |
The space of task, for Daily/Regular tally of High-Speed Train(KTX).
This building composed by sewage cleaning track/Bogie exchange
track/Simultaneous lifting track and other Machine/Electric
workplace/Synthesis warehouse, etc. |
Central administration office |
Main office space building to oversee the entire operational management of depot. |
Operational branchoffice |
Central control room which supervises entering and leaving of trains. |
Environmental maintenance shed(Cleaning shed) |
The building for general cleaning of High-speed train(KTX), in accordance with the provisions of the cleaning inspection. |
Wheel inspection shed |
The building that conducts automatic measurement for
wear/abrasion/crack/roundness of the wheels,
when the trains get into the base. |
Wheel washing shed |
The building that conducts water washing, brush work outside of the body, when the trains get into the base. |
Wheel-tread milling shed |
The building that conducts wheel turning when the malfunction of wheels such as abrasion. |
Substation |
The building that supplies electricity for operating the depot. |
Sewage disposal plant |
The building that dispose of sewage generated in the depot. |
Air compressor room |
The building that supplies compressed air spent in inspection shed, etc. |
Dry sand plant |
The building that manufactures sand spent for High-speed train(KTX) |
Rapid Transit Railway (Electric locomotive) Depot |
Light-repair factory |
The workplace that conducts daily/regular inspection of locomotive.
This building is consisted that mechanical / electrical workshop / warehouse,
and daily/regular/temporary inspection track/Air cleaning track/Entire cleaning track, etc. |
Heavy-repair factory |
The workplace that conducts heavy-repair of locomotive.
This building consists of body repair/wheelset repair/bogie
repair/rotary machine repair plant and mechanical / electrical workshop. |
Central administration building |
The building is located within the base, which oversees the management.
And there is a main office to administrate the entire operational management. For stored and released,
storage of the trains in the depot. |
Wheel inspection shed |
The building that conducts automatic measurement for wear/abrasion/crack/roundness of the wheels, when the trains get into the base, |
Wheel washing shed |
The building that conducts water washing, brush work of outside the body, when the trains get into the base. |
Wheel-tread milling shed |
The building that conducts wheel turning when the malfunction of wheels, like wear/abrasion. |
Substation |
The building that supplies electricity for operating of depot. |
Sewage disposal plant |
The building that dispose of sewage that generated in the depot. |
Air compressor room |
The building that supplies compressed air that is spent in inspection shed, etc |
Material storage |
The building that holds the various components / spares including spent in the train depot. |
Motor trolly shed |
The building that inspects and stores motor trollies. |
Recycling depository |
The building for storage of by-products, recyclable materials generated in the depot. |