Current State of Depot

  • Goyang Depot(High-Speed Train)
    Gross area
    1,423,532㎡(About 43 million pyeong)
    Building
    21 buildings (Building area: 114,512㎡, Architectural area: 125,650㎡)
    Capacity
    Storage 24 formation(489 cars), Inspection 44 formation/day(880 cars)
    Facility
    • Civil engineering / Track : Bridge 4 place(362.3m), Sidewalk Land Bridge 2 place(239m), Railway 31.93km, etc.
    • Architecture / Landscaping : Tally shed(420m), Central administration office, Operational branch office, Bodycleaning shed, Wheel inspection shed, Landscaping facility, etc.
    • Tally Equipment : Automatic wheel test equipment, Wheel turning equipment, Automatic body washer, Simultaneous lifting equipment, Dropping table, etc.
    • Architecture Equipment : Air conditioning and Ventilation, Tally shed Factory heating facility(Far-infrared radiation tube heater), Automatic Control Facility, etc.
    • Environment Equipment : Wastewater disposal equipment, Train sanitation equipment, Sand supply / Dry sand device, etc.
    • Electricity/Communication Equipment : Movable Trolly Wire(8 crew), Overhead catenary(33km), Distribution electricity(22kV) equipment, Premises Network, etc.
    • Signal Equipment : Electronic interlocking equipment(Entire section) main device, Manual track control crew, Switch point, Signal, etc.
    • Tally Information : Tally information system S/W, Backbone and Router switches, etc.
  • Busan Depot(High-Speed Train)
    Location
    Gaegeum-dong District, Danggam-dong, Busanjin-gu, Busan Metropolitan City
    Gross area
    360,920㎡(About 11 million pyeong)
    Building
    17 buildings(Building area 81,858㎡, Architectural area 99,236㎡)
    Capacity
    Storage 22 formation(440 cars), Inspection 37 formation/day(740 cars)
    Facility
    • Civil engineering / Track : Road 6,769m and Water and Sewage 14,849m, Railway 20,495km, etc.
    • Architecture / Landscaping : Tally shed(420m), Central administration office, Operational branch office, Body cleaning shed, Wheel inspection shed, Landscaping facility, etc.
    • Tally Equipment : Automatic wheel test equipment, Wheel turning equipment, Automatic body washer, Simultaneous lifting equipment, Dropping table, etc.
    • Architecture Equipment : Air conditioning and Ventilation, Tally shed Factory heating facility(Far-infrared radiation tube heater), Automatic Control Facility, etc.
    • Environment Equipment : Wastewater disposal equipment, Train sanitation equipment, Sand supply / Dry sand device, etc.
    • Electricity/Communication Equipment : Movable Trolly Wire, Overhead catenary(20.78km), Electrical pole, Rigid beam, Premises Network, etc.
    • Signal Equipment : Electronic interlocking equipment(Entire section) main device, Manual track control crew, Switch point, Signal, etc.
    • Tally Information : Tally information system S/W, Backbone and Router switches, etc.
  • Pyeongnae Depot(Rapid Transit Railway)
    Location
    Jingeon-eup and Pyeongnae-dong District, Namyangju-si, Gyeonggi-do
    Gross area
    1,262,809㎡(About 8 million pyeong)
    Building
    16 buildings including Light-repair Factory
    Capacity
    Storage 220 cars/day, Light-repair 270 cars/day, Heavy-repair 140 cars/day
    Facility
    • Civil engineering / Track : Bridge 4 places (362.3m), Sidewalk Land Bridge 2 places (239m), Railway 31.93km, etc.
    • Architecture / Landscaping : Light-repair Factory, Heavy-repair Factory, General management building, Body cleaning shed, Wheel inspection shed, Landscaping facility, etc.
    • Tally Equipment : Automatic wheel test equipment, Wheel turning equipment, Automatic body washer, Train test equipment and All sorts of test equipment, etc
    • Architecture Equipment : Air conditioning and Ventilation, Factory heating facility, Automatic control facility, Air compression facility etc
    • Environment Equipment : Wastewater disposal equipment, Bogie painting facility, etc
    • Electricity/Communication Equipment : Overhead catenary, Distribution facility, Premises Network, etc
    • Signal Equipment : Electronic interlocking equipment, Switch point, Signal, etc
  • Yongmun Depot(Rapid Transit Railway)
    Location
    Hwajeon-ri District, Yongmun-myeon, Yangpyeong-gun, Gyeonggi-do
    Gross area
    About 261,157㎡
    Building
    15 buildings besides Light-repair Factory
    Capacity
    Storage 220 cars/day,Light-repair Factory 270 cars/day
    Facility
    • Civil engineering / Track : Earthwork 228 million ㎡, Bridge 7 place etc
    • Architecture / Landscaping : Light-repair Factory, General management building, Body cleaning shed, Wheel inspection shed, Landscaping facility, etc
    • Tally Equipment : Automatic wheel test equipment, Wheel turning equipment, Automatic body washer, Train test equipment and All sorts of test equipment, etc
    • Architecture Equipment : Air conditioning and Ventilation, Factory heating facility, Automatic control facility, Air compression facility, etc
    • Environment Equipment : Wastewater disposal equipment, etc
    • Electricity/Communication Equipment : Overhead catenary, Distribution facility, Premises Network, etc
    • Signal Equipment : Electronic interlocking equipment, Switch point, Signal, etc

Details of the Depot Building

Details of the Depot Building
Assortment Purpose
High-Speed Railroad Depot Tally shed The space of task, for Daily/Regular tally of High-Speed Train(KTX). This building composed by sewage cleaning track/Bogie exchange track/Simultaneous lifting track and other Machine/Electric workplace/Synthesis warehouse, etc.
Central administration office Main office space building to oversee the entire operational management of depot.
Operational branchoffice Central control room which supervises entering and leaving of trains.
Environmental maintenance shed(Cleaning shed) The building for general cleaning of High-speed train(KTX), in accordance with the provisions of the cleaning inspection.
Wheel inspection shed The building that conducts automatic measurement for wear/abrasion/crack/roundness of the wheels, when the trains get into the base.
Wheel washing shed The building that conducts water washing, brush work outside of the body, when the trains get into the base.
Wheel-tread milling shed The building that conducts wheel turning when the malfunction of wheels such as abrasion.
Substation The building that supplies electricity for operating the depot.
Sewage disposal plant The building that dispose of sewage generated in the depot.
Air compressor room The building that supplies compressed air spent in inspection shed, etc.
Dry sand plant The building that manufactures sand spent for High-speed train(KTX)
Rapid Transit Railway (Electric locomotive) Depot Light-repair factory The workplace that conducts daily/regular inspection of locomotive. This building is consisted that mechanical / electrical workshop / warehouse, and daily/regular/temporary inspection track/Air cleaning track/Entire cleaning track, etc.
Heavy-repair factory The workplace that conducts heavy-repair of locomotive. This building consists of body repair/wheelset repair/bogie repair/rotary machine repair plant and mechanical / electrical workshop.
Central administration building The building is located within the base, which oversees the management. And there is a main office to administrate the entire operational management. For stored and released, storage of the trains in the depot.
Wheel inspection shed The building that conducts automatic measurement for wear/abrasion/crack/roundness of the wheels, when the trains get into the base,
Wheel washing shed The building that conducts water washing, brush work of outside the body, when the trains get into the base.
Wheel-tread milling shed The building that conducts wheel turning when the malfunction of wheels, like wear/abrasion.
Substation The building that supplies electricity for operating of depot.
Sewage disposal plant The building that dispose of sewage that generated in the depot.
Air compressor room The building that supplies compressed air that is spent in inspection shed, etc
Material storage The building that holds the various components / spares including spent in the train depot.
Motor trolly shed The building that inspects and stores motor trollies.
Recycling depository The building for storage of by-products, recyclable materials generated in the depot.